Gateway Gulf is a tier 4 Data center located in Bahrain.
Main responsibilities include:
Projects:
Main responsibilities include:
Completed Projects:
Worked in a fully in-sourced environment.
Complete Network Design, Installation, and software configuration. Project also included Network design documents (LLD, HLD, network connectivity sheets, NRFU testing, Fiber design, technical training for handover to customer).
Enterprize Data Network was running separate on leased lines through out Pakistan. This project was initiated to converge all EDN sites (Call Centers, Sales & Service Centers, Office) to vacate the leased media and add EDN as a costumer to MPLS backbone.
This required configurations on PE's and CE's during the allotted activity window. Also required travel through out different cities to accomplish this task.
A total of 15 sites were converged in this project for Central-1 region, and took 3 months to finish.
This project was initiated to add Sigtran(IP-Signaling) as a customer to MPLS backbone. Core Switching sites were to be integrated over MPLS and linked via separate HLR to HLR, HLR to MSC, HLR to Mediagateway.
Probes were also added to monitor the performance end to end from one city to another
Gold Medal for Scoring highest Marks in Intermediate From Cresecent Model Higher Secondary School from the serving Chief Minister Perviaz Elahi.