Over 19 years of working experience in civil water, building and infrastructure projects as a site management team member, design support team member and quantity surveyor of consultancy and contracting in the UAE and Bahrain.
Water Projects:
Worked as a site management team member and design support team member in consultancy and quantity surveyor in contracting for the projects of water pumping station, transmission pipeline, domestic water metering, distribution network pipeline and potable water storage reservoir. Familiar with pipeline international code and standards.
Building and infrastructure:
Worked as a site management team member for utilities relocation project, quantity surveyor, site engineer in contracting for the building and infrastructure projects.
Experience in operation and maintenance construction and commissioning including monthly valuations, liaison with client and contractor organizations concerning technical and financial issues providing design and technical support and on-site health and safety procedures, also familiar with quality control tests for concrete and earth work at site and in laboratory.
INVOLVED IN TENDERING FOR THE EWA AND MOW WORKS. PLANNING, EXECUTION & COMMISSIONING OF SUB CONTRACT, TERM CONTRACT AND MAINTENANCE WORKS OF WATER SUPPLY DISTRIBUTION (WDD) WORKS, WATER TRANSMISSION (WTD) WORKS, SANITARY ENGINEERING PLANNING AND PROJECT DIRECTORATE (SEPPD) WORKS (INSTALLATION OF DI, GRP, UPVC HDPE PIPELINE, CHAMBERS CONSTRUCTION, MANHOLE CONSTRUCTION, HOUSE CONNECTIOS ETC.) AND RELATED CIVIL WORKS
1. Sewer Connections to Various Properties in Malkiya Block 1032 (on going)
Client: SEPPD Ministry of Works Bahrain
Project Value Approx. 167 K BHD
Lead the team for sewerage pipeline networks construction including manholes, chambers, house connections. Involved in obtaining work permit, traffic permit, preparation of bill and get approval of the same from Client.
2. 600mm DI Pipeline work in Sitra CBS
Client: EWA WTD Bahrain
Project Value Approx. 30 K BHD
Lead the team to finish the WTD work involving construction of pipeline, valve chamber, thrust block, above ground pipeline for tanker filling point and fire hydrant box
3. Various EWA WDD MTC Job
Client: EWA WDD Bahrain
Involved in the EWA WDD MTC job for various areas in Bahrain. Works related to construction of pipeline, valve chambers, thrust blocks, house connections.
(1) East Sitra Housing Project Phase-1 (on going)
Client: Ministry of Housing
Project Value Approx. 300 Million BHD
Involved in all infrastructure works; deep gravity sewer, storm water drainage, potable water, TSE and irrigation water pipeline networks, road construction works and landscaping works.
(2) Restoration of Bahrain Civil Aviation Affairs Head Quarter Building (1st Terminal of Bahrain International Airport)
Client: Civil Aviation Authority Bahrain
Project Value Approx. 4.5 Million BHD
Involved in civil, architectural building works and infrastructural works for some time.
(3) Private Villa of Sheikh Khalifa Bin Khaled at Riffa
Client: Sheikh Khalifa Bin Khaled
Project Value Approx. 2.7 Million BHD
Involved in civil, architectural building works for some time.